The Michigan Department of Transportation (MDOT) introduced its first application of dynamic part-time shoulder use (D-PTSU) on the US-23 corridor in November 2017 to mitigate recurring congestion. This project referred to as the Flex route involved widening the left shoulder, which now serves as a temporary travel lane during between M-14 and M-36 during periods of heavy congestion. As the application of D-PTSU is relatively novel in the United States, especially the use of the left shoulder, this study evaluates the operational and safety performance of the US-23 Flex route and provides guidance for future implementation of similar facilities in Michigan and elsewhere. The evaluation assessed various metrics, including average travel time, travel time reliability, driver compliance, and incident clearance times. The findings show that operations of the US-23 Flex route have improved significantly, especially in the southbound direction. While the northbound direction also showed better performance after the Flex lane opened in general, some of the prior congestion has shifted to the end of the Flex route in the northbound direction due to a bottleneck that was introduced at the end terminal. Fortunately, this problem is expected to be alleviated by the planned extension of the Flex lane to I-96 in 2024. The operational analyses also showed improved operations when special events occurred, such as football games and holidays. Incident clearance times largely decreased after the Flex route was opened. Part-time shoulder running also provided an additional travel lane during peak periods, such as University of Michigan home football games, reducing such non-recurrent congestion. Crash data were compared for a period of five years (i.e., 2012 to 2016) before the construction of the Flex route, and two years (i.e., 2018 and 2019) after its completion. After considering increases in traffic volume, crashes were reduced by 17 percent when considering all times of day, in
This study evaluates the operational and safety impacts of a novel dynamic part-time shoulder use (D-PTSU) system implemented on the US-23 corridor. The Michigan Department of Transportation introduced this system, known as the Flex route, to alleviate recurring congestion by utilizing the left shoulder as a temporary travel lane during peak hours. The research assesses key performance indicators such as travel time, reliability, driver compliance, and incident clearance, comparing pre- and post-implementation data to provide guidance for future similar projects.
The study presents a comprehensive evaluation of the US-23 Flex route's operational and safety performance, indicating significant improvements in travel times and incident clearance, particularly in the southbound direction. While the northbound direction also saw general performance gains, a bottleneck was identified at the end of the Flex route, which is anticipated to be resolved with planned extensions. The findings suggest that part-time shoulder running effectively mitigates both recurrent and non-recurrent congestion, including during high-demand events like football games. Crash data analysis, adjusted for traffic volume increases, indicates a notable reduction in collisions post-implementation.
Page Count:
131
Publication Date:
2022-01-01
Publisher:
Michigan State University. Civil Engineering
ISBN-13:
9798841793601
No comments yet. Be the first to share your thoughts!