Accurate and complete construction records and as-built data are the key prerequisites to the effective management of transportation infrastructure assets throughout their life cycle. The construction phase is the best time to collect such data. Assets such as underground drainage and culverts are visible and physically accessible only during construction. For assets such as guardrails, signals, and pavement, it is safer and more efficient to collect data during construction than after construction when the road segment is open to traffic. The purpose of this project was to conduct a synthesis study to (1) assess the current status at INDOT regarding the collection of asset data during the construction phase and the use of such data in the operation and maintenance (O&M) phase, and (2) develop a framework for INDOT to leverage the construction inspection and documentation process to collect data for assets. Data needs during O&M were identified through rounds of meetings with relevant INDOT business units. The current practice in construction documentation was investigated in detail. A survey of state highway agencies (SHAs) was conducted to assess the state-of-the-practice.A practical framework was developed to leverage the construction inspection and documentation practice to collect asset data that are needed in O&M. It is composed of (1) a data needs component for determining the information requirements from the O&M perspective, (2) a construction documentation module, and (3) a mapping mechanism to link data items to be collected during the construction documentation to data items in the asset management systems. The mapping mechanism was tested and validated using four priority asset classes--underdrains, guardrails, attenuators, and small culverts--from an INDOT construction project. The testing results show that the newly developed framework is viable and solid to collect asset data during the construction phase for O&M use in the future, without adding ext
This study investigates the critical need for robust data collection during road construction to ensure effective long-term infrastructure asset management. The research addresses the challenge of gathering accurate and complete construction records, particularly for assets like underground drainage, culverts, guardrails, signals, and pavement, which are most accessible and efficiently documented during the construction phase. It aims to develop a practical framework for the Indiana Department of Transportation (INDOT) to integrate asset data collection into existing construction inspection and documentation processes, thereby supporting operation and maintenance (O&M) needs throughout the asset lifecycle.
This synthesis study provides a detailed analysis of current practices and proposes a viable framework for improving asset data management in road construction. The research methodology, involving stakeholder engagement, current practice investigation, and a survey of peer agencies, lends credibility to its findings. The validation through case studies demonstrates the practical applicability of the developed framework for INDOT and potentially other transportation agencies. The study concludes that the proposed system is effective for collecting essential asset data during construction for future O&M use.
Page Count:
0
Publication Date:
2015-12-31
Publisher:
Purdue University Press
ISBN-10:
1622603729
ISBN-13:
9781622603725
No comments yet. Be the first to share your thoughts!